EX-02

Working

Excavator · Caterpillar 349 (2013) · 15,796 h · Scroggie Creek

Last seen 13:09:19

Digital twin
Live machine view
Work cycle, load, fuel and lamps follow live telemetry. Drag to rotate, scroll to zoom.
Working
Assignment
Feeding WP-2
Operator Kellie Bashirian

Wash plant

s-scr-wp2

Hours today

5.0 h

Cycle time

30s

Cycles today

466

Engine hours

15,796 h

Next service

in 255 h

Telemetry
Live readings

Engine speed

1,778rpm

Coolant

92.8°C

Hydraulic oil

77.1°C

Hydraulic pressure

325bar

Bucket fill

100%

Fuel burn

62L/h
Fuel
Tank level
55%

683 L

In tank

62.0 L/h

Burn

10.9 h

Range

Utilisation
Hours on this shift

5.0 h

of a 12 h shift · 42% utilisation

Load

100%

Engine speed

1,778 rpm

Coolant

93 °C

Per hour
Utilisation and fuel burned today
Production day starts at 07:00.

Utilisation · %

Fuel · L

Alarms
Alarms (0)

No alarms on this unit in the last 48 hours.

Engine history
Engine speed, coolant and fuel level

Engine speed · rpm

Coolant · °C

Fuel level · %