Monte Cañón

Degraded

Galicia · Wind · 74 MW installed · 6 technicians · manager Kiarra Swaniawski

Output now

29.9 MW

Load factor

40 %

Energy today

421 MWh

Availability

96.9 %

Producing

12 / 16

Open alarms

4

Generation
Last 12 hours
Wind, solar and battery power at the point of interconnection. A charging battery shows below zero.
Conditions
Resource and grid

Wind

13.6 m/s NW

Irradiance

456 W/m²

Temperature

22.1 °C

Cloud cover

31 %

Conditions

Sunny intervals

Substation

Mesón SE 220 kV

Voltage

219.7 kV

Frequency

50.015 Hz

Power factor

0.990

Curtailment

19 %

Day-ahead price

56.26 €/MWh

Assets

16 assets on site. Open one for its live 3D view.

Power flow

Wind turbine

WTG-01

Siemens Gamesa SG 5.0-145 · 6.2 MW

Producing
92%

Output

5.68 MW

Today

31.8 MWh

Wind

12.9 m/s

Wind turbine

WTG-02

Siemens Gamesa SG 6.6-170 · 4.2 MW

Producing
89%

Output

3.73 MW

Today

32.5 MWh

Wind

11.6 m/s

Wind turbine

WTG-03

Nordex N149/4.0-4.5 · 6.2 MW

Producing
29%

Output

1.77 MW

Today

41.1 MWh

Wind

8.7 m/s

Wind turbine

WTG-04

Siemens Gamesa SG 5.0-145 · 5.0 MW

Producing
15%

Output

0.73 MW

Today

32.4 MWh

Wind

7.4 m/s

Wind turbine

WTG-05

Nordex N149/4.0-4.5 · 6.2 MW

Producing
14%

Output

0.88 MW

Today

35.7 MWh

Wind

7.4 m/s

Wind turbine

WTG-06

Vestas V162-6.2 · 5.0 MW

Producing
8%

Output

0.42 MW

Today

34.9 MWh

Wind

6.6 m/s

Wind turbine

WTG-07

Vestas V162-6.2 · 4.2 MW

Curtailed
5%

Output

0.20 MW

Today

15.1 MWh

Wind

6.7 m/s

Wind turbine

WTG-08

Nordex N149/4.0-4.5 · 6.2 MW

Producing
10%

Output

0.63 MW

Today

30.6 MWh

Wind

6.7 m/s

Wind turbine

WTG-09

Vestas V150-4.2 · 6.2 MW

Producing
98%

Output

6.09 MW

Today

44.3 MWh

Wind

13.2 m/s

Wind turbine

WTG-10

Siemens Gamesa SG 5.0-145 · 6.2 MW

Producing
91%

Output

5.64 MW

Today

29.0 MWh

Wind

13.4 m/s

Wind turbine

WTG-11

Siemens Gamesa SG 6.6-170 · 5.0 MW

Producing
12%

Output

0.61 MW

Today

33.3 MWh

Wind

7.0 m/s

Wind turbine

WTG-12

Vestas V162-6.2 · 5.0 MW

Standby
0%

Output

0.00 MW

Today

31.6 MWh

Wind

7.2 m/s

Wind turbine

WTG-13

Siemens Gamesa SG 5.0-145 · 4.2 MW

Producing
72%

Output

3.02 MW

Today

19.9 MWh

Wind

11.2 m/s

Wind turbine

WTG-14

Vestas V150-4.2 · 4.2 MW

Curtailed
13%

Output

0.53 MW

Today

8.7 MWh

Wind

8.5 m/s

Inverter skid

INV-01

SMA Sunny Central 4600 UP · 5.0 MVA

Producing
36%

Output

1.80 MW

Today

28.2 MWh

Availability

99.6 %

Inverter skid

INV-02

Sungrow SG3125HV-MV · 5.0 MVA

Curtailed
27%

Output

1.32 MW

Today

22.6 MWh

Availability

94.2 %

Alarms
Site alarms
Most recent events from this site's assets.

Blade ice detected

WTG-02· 10-20 09:10
medium

IGBT temperature high

INV-02· 10-20 02:19
low

Pitch system hydraulic pressure low

WTG-05· 10-19 18:53
low

Yaw misalignment above limit

WTG-07· 10-19 14:34
low